
Step 1
Use PPR CUTTER to cut the pipe, and the cut should be smooth and free of burrs

Step 2
Clean the welding parts of pipes and fittings to avoid sand, dust, and other damage to the quality of the joints.

Step 3
choose right size welding head and heated to 260°C.

Step 4
Mark the weld depth on the pipe

Step 5
At the same time, the pipe and pipe fittings are inserted into the fusion splicer and heated according to the specified time.

Step 6
After heating, push the pipe and pipe fittings vertically and maintain them for more than 5 seconds, not too hard to prevent bending.








